Tuesday, December 2, 2025

First ECRL trains anticipated at Kuantan Port by end-Dec

First ECRL trains expected at Kuantan Port by end-Dec

The primary cargo of East Coast Rail Hyperlink (ECRL) trains – two passenger electrical a number of models (EMU) and two items electrical locomotives (E-Loco) – is anticipated to land at Kuantan Port by the tip of this month, Named reviews.

“The primary set of EMU and E-Loco trains has been authorized for cargo in keeping with schedule after present process complete testing and a Manufacturing unit Acceptance Take a look at (FAT) report, which was not too long ago acquired and verified by Malaysia Rail Hyperlink (MRL) because the ECRL asset proprietor,” an MRL-China Communications Building (ECRL) Sdn Bhd (CCCECRL) joint assertion stated, including that the cargo is able to go away Dalian Port, with logistics anticipated to take a few month.

Constructed by China Railway Rolling Inventory Company (CRRC) on the confirmed CR200J and HXD3C expertise platforms, the EMUs and locomotives have been tailored to Malaysia’s local weather, terrain, and passenger necessities. MRL CEO Datuk Seri Darwis Abdul Razak stated in the identical assertion that the trains would bear complete testing, together with an 8,000-km fault-free run underneath Land Public Transport Company (APAD) supervision, earlier than they enter service in January 2027.

9 extra EMUs and the remaining 10 E-Locos are set to reach subsequent yr in phases. The EMUs function a prepare community management system with twin redundancy for real-time traction, excessive voltage, and auxiliary methods monitoring, enterprise and financial system class cabins, wheelchair accessibility, prayer rooms with ablution amenities, and scorching water for drinks, whereas a passenger info system will present real-time updates on schedules, routes and any delays.

In the meantime, the E-Locos function clever human-machine interfaces and millisecond-level security monitoring for braking methods, fireplace safety and high-voltage insulation. The blue-and-white ECRL livery is alleged to be impressed by Malaysia’s coastal landscapes and wildlife.

The 665 km-long rail venture connects Kota Bharu to Port Klang. It’s anticipated to chop journey time to 4 hours from seven by highway (or over 12 hours throughout festive seasons).

Section 1 (Kota Bharu-Gombak Built-in Terminal) is scheduled for completion by December 2026, with operations set to start in January 2027. Section 2 (Gombak-Port Klang) is anticipated to be accomplished by December 2027 and develop into operational by January 2028. Most speeds are 160 km/h for passenger trains and 80 km/h for items trains.

The venture, which spans Kelantan, TerengganuPahang, and Selangor, is now practically 90% full. Plans are being mentioned to prolong the ECRL to Rantau Panjangwhich is on the Kelantan facet of the Malaysian-Thai border; Golok River being on the opposite facet.

Trying to promote your automotive? Promote it with Automobile.


Related Articles

LEAVE A REPLY

Please enter your comment!
Please enter your name here

Latest Articles